The Impact of Failure Types in Construction Production Systems on Economic Risk Assessments in the Bidding Phase

Table 2

Availability, cost, and capacity of the system.

No.Syst./failures ($) ($) () ()

1Dependent0.93101013.001138.73100.0088.96940.001009.676.975.00
2Independent0.92981013.001140.13100.0088.84940.001010.977.105.00