Table 3
Unit cost, quantity, and planned and real total costs of the system.
No.
($/t)
($/
)
(
)
($)
($)
(%)
1
10.13
12.80
94,000.00
952,220.00
1,203,200.00
26.35
2
10.13
12.83
94,000.00
952,220.00
1,206,020.00
26.65