A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm
Table 6
Results of one-way ANOVA test for medium-scale instances.
DF
SS
MS
-Value
-Value
Test results
IWOA-WOA
1
270.3
270.34
16.21
0.00
Means are significantly different
Error
72
1200.9
16.68
Total
73
1471.2
IWOA-GA
1
40.89
40.89
3.51
0.065
Means are equal
Error
72
839.14
11.65
Total
73
880.04
IWOA-PSO
1
0.396
0.396
0.04
0.839
Means are equal
Error
72
686.03
9.528
Total
73
686.43
GA-PSO
1
33.25
33.25
3.20
0.078
Means are equal
Error
72
747.25
10.38
Total
73
780.49
DF: degree of freedom; SS: sum of squares; MS: mean squares.