Research Article

A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm

Table 6

Results of one-way ANOVA test for medium-scale instances.

DFSSMS-Value-ValueTest results

IWOA-WOA1270.3270.3416.210.00Means are significantly different
Error721200.916.68
Total731471.2

IWOA-GA140.8940.893.510.065Means are equal
Error72839.1411.65
Total73880.04

IWOA-PSO10.3960.3960.040.839Means are equal
Error72686.039.528
Total73686.43

GA-PSO133.2533.253.200.078Means are equal
Error72747.2510.38
Total73780.49

DF: degree of freedom; SS: sum of squares; MS: mean squares.