A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm
Table 8
Results of the one-way ANOVA test for large-scale instances
DF
SS
MS
value
value
Test results
IWOA-WOA
1
313.2
313.2
9.39
0.003
Means are significantly different
Error
82
2737.2
33.34
Total
83
3047.4
IWOA-GAMPC
1
400.2
400.16
12.62
0.001
Means are significantly different
Error
82
2599.3
31.70
Total
83
2999.4
IWOA-SPSO
1
47.82
47.82
0.98
0.325
Means are equal
Error
82
4006.18
48.86
Total
83
4054.00
GAMPC-SPSO
1
724.7
724.65
16.56
0.00
Means are significantly different
Error
82
3587.2
43.75
Total
83
4311.8
DF: degree of freedom; SS: sum of squares; MS: mean squares