Research Article

A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm

Table 8

Results of the one-way ANOVA test for large-scale instances

DFSSMS value valueTest results

IWOA-WOA1313.2313.29.390.003Means are significantly different
Error822737.233.34
Total833047.4

IWOA-GAMPC1400.2400.1612.620.001Means are significantly different
Error822599.331.70
Total832999.4

IWOA-SPSO147.8247.820.980.325Means are equal
Error824006.1848.86
Total834054.00

GAMPC-SPSO1724.7724.6516.560.00Means are significantly different
Error823587.243.75
Total834311.8

DF: degree of freedom; SS: sum of squares; MS: mean squares