Minimization of Drug Shortages in Pharmaceutical Supply Chains: A Simulation-Based Analysis of Drug Recall Patterns and Inventory Policies
| Parameter | Definition | Value |
| (Time to review inventory and place an order at Hc, Ws, Ds, Mn) | Review period length | 1 week | (Lead-time from the upstream node to a downstream node) | Time required to transport/ship products between upstream nodes and downstream nodes | 2 weeks | Manufacturing cycle time | Time between the production decision point and the first shipment point | 3 weeks | (Forecast demand time period Hc, Ws, Ds, Mn) | Number of previous time periods used in the estimation and the forecast of demand | 12 weeks | (Cycle service level) | The CSL parameter defines the inventory policy and level of safety stock held by Hc, Ws, Ds, and Mn | 0.95 (initial value) |
|
|