Research Article
ANN Based Approach for Estimation of Construction Costs of Sports Fields
Table 3
Significance of correlations between the variables (source: own study).
| Preselected cost predictors | Is the correlation between the dependent variable, total cost of construction works, and independent variable significant for value < 0.05? | Variable’s symbol (for accepted variables only) |
| Playing area of the sports field | Yes | | Location of the sports ground | No | - | Number of sport functions | No | - | Type of the playing field surface | Yes | | Quality standard of the playing field’s surface | Yes | | Ball stop net’s surface | Yes | | Arranged area for communication | Yes | | Fencing length | Yes | | Arranged greenery area | Yes | |
|
|