Research Article

ANN Based Approach for Estimation of Construction Costs of Sports Fields

Table 3

Significance of correlations between the variables (source: own study).

Preselected cost predictors Is the correlation between the dependent variable, total cost of construction works, and independent variable significant for value  < 0.05?Variable’s symbol (for accepted variables only)

Playing area of the sports fieldYes
Location of the sports groundNo-
Number of sport functionsNo-
Type of the playing field surfaceYes
Quality standard of the playing field’s surfaceYes
Ball stop net’s surfaceYes
Arranged area for communicationYes
Fencing lengthYes
Arranged greenery areaYes