Research Article

Optimal Scheduling of a Microgrid Including Pump Scheduling and Network Constraints

Table 2

Cost breakdown and computational times for Scenarios 1–5.

Scenario # Uncontracted capacity cost ($)Interruptible load cost ($)Total cost ($)Percentage reduction in total costComputational time (s)

111,991.50-34,710.10-38.11
20-29,997.8013.58%60.59
30-29,945.1113.73%136.04
40864.2122,995.6333.75%60.81
50861.9022,911.7933.99%108.53