Research Article
Optimal Scheduling of a Microgrid Including Pump Scheduling and Network Constraints
Table 2
Cost breakdown and computational times for Scenarios 1–5.
| Scenario # | Uncontracted capacity cost ($) | Interruptible load cost ($) | Total cost ($) | Percentage reduction in total cost | Computational time (s) |
| 1 | 11,991.50 | - | 34,710.10 | - | 38.11 | 2 | 0 | - | 29,997.80 | 13.58% | 60.59 | 3 | 0 | - | 29,945.11 | 13.73% | 136.04 | 4 | 0 | 864.21 | 22,995.63 | 33.75% | 60.81 | 5 | 0 | 861.90 | 22,911.79 | 33.99% | 108.53 |
|
|