Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 1

Model variables.

Types of variablesSymbolDescription

SetsRSet of hydropower station candidates
SSet of scenarios of the operational stages

Deterministic variablesTThe planning horizon is composed of T operational stages
RminThe minimum required number of hydropower stations in the plan
eUnit construction fee (RMB/m3)
fUnit profit of power generation (RMB/KWh)
ΔtTime interval of each operational stage (h, which is the abbreviation of hour)
ciPenalty coefficient per unit in hydropower station candidate i (RMB/m3)
KiCoefficient of output of candidate i (kg/(m2·s2))
NiminThe minimum output of candidate i (kW)
NimaxThe maximum output of candidate i (kW)
HiWater head of candidate i (m)
ViminThe minimum required water storage of candidate i when it is selected (m3)
QimaxThe maximum discharge limit of local area around candidate i (m3/h)
QFimaxThe upper limit water discharge of candidate i (m3/h)
QFiminThe lower limit water discharge of candidate i (m3/h)
ri(t)Unit operational cost of candidate i at stage t (RMB/(m3·h))

Stochastic variablespsThe probability of stagewise scenario s
Outside water inflows in candidate i at stage t under scenario s (m3/h)
Water demands in candidate i at stage t under scenario s (m3/h)
Acceptance level of water discharge in local area surrounding candidate i at stage t under scenario s (m3/h)