Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 6

Predicted water inflows in each seasonal stage.

Candidate iStage (t = 1, 2, 3, 4)
SpringSummerAutumnWinter

Water inflows (m3 × 107/h)11.10595.32921.97220.1678
20.51261.52030.59970.0817
30.49261.22020.60890.0813
40.30030.54330.29120.0725
50.66491.14310.55540.1446