Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 8

Estimation gaps of the DE model.

Discount factor δPlanning stages
T = 4T = 8T = 12

0.9925.53%22.51%19.94%
0.9517.89%6.71%−2.99%
0.908.72%−9.76%−24.32%
0.85−0.51%−23.20%−39.73%
0.80−9.16%−34.34%−50.97%
0.75−17.29%−43.92%−59.59%
0.70−24.72%−51.99%−66.37%
0.65−31.44%−58.62%−71.61%
0.60−37.53%−64.02%−75.64%