Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 9

Average computational time (ms) of both models.

ModelT = 4T = 8T = 12

DE model1224.001206.441170.22
MSSP model300.223095.56159373.22