Research Article
Optimal Dispatch of Reactive Power Using Modified Stochastic Fractal Search Algorithm
Table 11
The information of IEEE 30-bus system and IEEE 118-bus system.
| Power system | IEEE 30-bus system | IEEE 118-bus system |
| Number of transmission lines | 41 | 186 | Number of generator buses | 6 | 54 | Number of transformers | 4 | 9 | Number of capacitor banks | 9 | 14 | Number of control variables | 19 | 77 | Total active power of loads (MW) | 283.4 | 4,242 | Total reactive power of loads (MVAR) | 126.2 | 1,438 | Total active power of generators (MW) | 288.67 | 132.863 |
|
|