Research Article

Optimal Dispatch of Reactive Power Using Modified Stochastic Fractal Search Algorithm

Table 11

The information of IEEE 30-bus system and IEEE 118-bus system.

Power system IEEE 30-bus systemIEEE 118-bus system

Number of transmission lines41186
Number of generator buses654
Number of transformers49
Number of capacitor banks914
Number of control variables1977
Total active power of loads (MW)283.44,242
Total reactive power of loads (MVAR)126.21,438
Total active power of generators (MW)288.67132.863