Research Article
Optimal Dispatch of Reactive Power Using Modified Stochastic Fractal Search Algorithm
Table 13
Setting limits for IEEE 118-bus system.
| Limits of Capacitor banks (MVAR) | Reactive power limits of generators (MVAR) |
| Bus | | | | |
| 5 | -40 | 0 | -500 | 500 |
| 34 | 0 | 14 | Voltage limits of generator buses (Pu) |
| 37 | 25 | 0 | | |
| 44 | 0 | 10 | 0.95 | 1.1 |
| 45 | 0 | 10 | Voltage limits of load buses (Pu) |
| 46 | 0 | 10 | | |
| 48 | 0 | 15 | 0.95 | 1.05 |
| 74 | 0 | 12 | Transformer tap setting limits (Pu) |
| 79 | 0 | 20 | | |
| 82 | 0 | 20 | 0.9 | 1.1 |
| 83 | 0 | 10 | | |
| 105 | 0 | 20 | | |
| 107 | 0 | 6 | | |
| 110 | 0 | 6 | | |
|
|