Research Article
A Continuous Approximation Approach Based on Regular Hexagon Partition for the Facility Location Problem under Disruptions Risk
Table 6
The different ratio of expected total cost caused by estimation error of q (%).
| ā | True q | 0.05 | 0.1 | 0.15 | 0.2 | Estimated q | 0.01 | 0.1 | 0.05 | 0.15 | 0.2 | 0.1 | 0.2 | 0.1 | 0.15 | 0.3 |
| Difference ratio of expected total cost | r=1.25 | 2.85 | 1.54 | 1.52 | 0.58 | 0.82 | 0.58 | 0.23 | 0.81 | 0.23 | 0.00 | r=1.5 | 4.19 | 2.67 | 2.60 | 1.59 | 2.72 | 1.56 | 1.11 | 2.65 | 1.10 | 0.99 | r=1.75 | 4.93 | 3.56 | 3.43 | 2.21 | 3.88 | 2.17 | 1.63 | 3.73 | 1.60 | 2.03 | r=2 | 5.67 | 4.08 | 3.92 | 2.83 | 4.90 | 2.75 | 2.01 | 4.67 | 1.97 | 2.80 | r=3 | 7.47 | 5.82 | 5.50 | 4.15 | 7.48 | 3.99 | 3.19 | 6.96 | 3.09 | 4.64 |
|
|