Research Article

A Novel MOEA/D for Multiobjective Scheduling of Flexible Manufacturing Systems

Table 3

Scheduling results of 2-objective problem (FMS01-FMS20).

InstancesNPSMIDRAS
DNSGA-IIDMOEA/DDNSGA-IIDMOEA/DDNSGA-IIDMOEA/D

FMS012.12.0218.33199.240.800.76
FMS022.02.7412.45350.200.840.79
FMS032.32.4657.22584.420.910.87
FMS042.62.6990.17875.011.040.98
FMS052.83.11644.121436.081.081.09
FMS062.02.3190.50165.820.570.55
FMS072.83.9361.71302.640.610.57
FMS083.33.8602.29537.690.720.65
FMS093.84.2917.27827.271.050.97
FMS103.94.81525.181354.031.101.04
FMS112.21.9158.93132.090.550.41
FMS122.42.5323.24257.430.560.58
FMS133.14.0568.74516.870.720.70
FMS144.24.6858.91779.250.880.83
FMS154.54.71437.071320.080.981.04
FMS161.81.8129.86118.010.520.43
FMS172.43.0242.64199.140.550.54
FMS183.03.2547.16508.870.720.80
FMS193.44.2827.83753.600.900.92
FMS203.64.31358.921182.490.970.99