Research Article

A Novel MOEA/D for Multiobjective Scheduling of Flexible Manufacturing Systems

Table 4

Scheduling results of 3-objective problem (FMS01-FMS20).

InstancesNPSMIDRAS
DNSGA-IIDMOEA/DDNSGA-IIDMOEA/DDNSGA-IIDMOEA/D

FMS013.24.4246.15218.6110.478.54
FMS023.95.5486.50423.764.422.18
FMS034.34.1812.69703.041.891.41
FMS044.54.71184.471035.122.241.79
FMS054.45.21982.921802.272.372.02
FMS063.54.8207.96174.2921.2619.82
FMS074.55.0398.74341.403.102.87
FMS084.46.3739.06621.451.921.27
FMS095.85.91115.63965.832.011.61
FMS105.56.01870.841685.442.241.96
FMS113.32.5170.02137.7730.3628.23
FMS123.53.6320.57263.893.723.47
FMS133.94.9671.11589.061.821.08
FMS145.86.01054.72946.011.871.62
FMS155.76.21759.811594.492.191.94
FMS162.22.6144.56112.4240.6641.47
FMS173.22.5247.30191.2312.0210.76
FMS184.04.8617.54542.481.140.93
FMS195.15.2977.95856.202.061.47
FMS205.05.91668.031576.652.382.04