Scheduling results of 2-objective problem (In01-In16).

InstancesNPSMIDRAS
DNSGA-IIDMOEA/DDNSGA-IIDMOEA/DDNSGA-IIDMOEA/D

In011.41.6465.13384.320.690.73
In021.32.0646.31563.240.810.78
In031.51.7886.41752.050.990.81
In041.72.11089.87920.631.080.83
In051.41.7396.37366.640.680.68
In061.61.6526.92523.220.860.72
In071.51.5691.50699.440.950.83
In081.51.9882.66839.750.990.82
In091.61.8339.47298.180.650.58
In101.51.6476.35451.600.770.62
In111.72.0585.71559.660.840.68
In121.61.8719.93655.980.830.69
In131.41.5328.30263.180.610.54
In141.61.7465.32416.400.710.61
In151.61.5550.88514.230.790.66
In161.71.7687.50654.510.850.72