A Novel MOEA/D for Multiobjective Scheduling of Flexible Manufacturing Systems

Table 7

Scheduling results of 3-objective problem (In01-In16).

InstancesNPSMIDRAS
DNSGA-IIDMOEA/DDNSGA-IIDMOEA/DDNSGA-IIDMOEA/D

In011.82.2467.16412.224.323.53
In021.61.8793.22662.403.801.98
In032.12.01061.19847.263.521.79
In042.12.11299.541056.083.061.43
In051.61.8423.02372.254.863.08
In062.02.0674.95577.324.422.06
In072.22.4956.23725.513.931.90
In082.32.51129.71909.893.691.58
In091.91.9354.21319.515.233.22
In102.52.6562.76460.274.972.38
In111.92.1785.41636.384.481.76
In122.52.8977.70761.754.011.61
In132.11.8309.61263.675.824.58
In142.32.5500.26432.114.782.49
In152.52.7729.43572.324.732.01
In162.12.4891.41681.564.241.79