Research Article

Comparative Simulation Analysis of the Performance of the Logistics Manufacturing System at the Operative Level

Table 8

Comparison of results for strategies and available heuristics.

StrategyHeuristicTotal production timeEffective production timeRobotic arm workTotal replacement timeLost flow capacityFinal flow capacityTotal transportation timeSystem state indicatorSystem wear indicatorSystem flexibility indicator

i.1542242082117121410,3764,479030,480,740,60
254584227214012317,7870,069090,430,730,56
3542242082117121410,3764,479030,480,740,60
4542242082117121410,3764,479030,480,740,60

ii.1447828282396165010,3764,477460,490,910,67
244662844236416207,8877,957440,430,920,63
3447828282396165010,3764,477460,490,910,67
4447828282396165010,3764,477460,490,910,67