Research Article

Buoyancy Force Acting on Underground Structures considering Seepage of Confined Water

Table 2

Summary of system calibration, homogeneous soil layer, and overlying aquiclude tests.

Test seriesTest caseDescription

System calibrationS0The structure is placed in pure water.

Homogeneous sandH1The structure is embedded in fine sand, and the water head difference is 0.
H2The structure is embedded in fine sand, and the water head difference is 10 cm.
H3The structure is embedded in fine sand, and the water head difference is 20 cm.

Layered soil with confined waterO4The structure is embedded in overlying aquiclude, and the water head difference is 0.
O5The structure is embedded in overlying aquiclude, and the water head difference is 10 cm.
O6The structure is embedded in overlying aquiclude, and the water head difference is 20 cm.