Research Article
Investigation of Var Compensation Schemes in Unbalanced Distribution Systems
Table 1
Load and PV installation capacity.
| | Phase A | Phase B | Phase C |
| Peak load | 58 kW, 11.6kVar | 60 kW, 12kVar | 62 kW, 12.4kVar | PV capacity (Case 1) | 14.5 kW (25%) | 18 kW (30%) | 28 kW (45%) | PV capacity (Case 2) | 29 kW (50%) | 30 kW (50%) | 31 kW (50%) |
|
|