Research Article

Investigation of Var Compensation Schemes in Unbalanced Distribution Systems

Table 1

Load and PV installation capacity.

Phase APhase BPhase C

Peak load58 kW, 11.6kVar60 kW, 12kVar62 kW, 12.4kVar
PV capacity (Case 1)14.5 kW (25%)18 kW (30%)28 kW (45%)
PV capacity (Case 2)29 kW (50%)30 kW (50%)31 kW (50%)