Research Article

A Two-Level Metaheuristic Algorithm for the Job-Shop Scheduling Problem

Table 3

Experiment’s results on the set of orb instances.

InstanceOptGA [6]UPLA
Best%BSVDBest%BSVDAvg.%ASVDAvg. No. of ItersAvg. CPU Time (sec)

orb01105910771.700.0010690.931862312

orb028888890.118890.118890.112002393

orb03100510221.690.0010211.581862358

orb0410050.000.0010060.1167796

orb058878900.348890.238900.322002458

orb06101010211.0910130.3010190.932002525

orb073970.000.003990.551782096

orb088990.000.009091.071882338

orb099340.000.009350.0574884

orb109440.000.009440.0067817