Research Article
Decisions and Coordination in a Capacity Sharing Supply Chain considering Production Cost Misreporting
Table 2
Effect of the coordination contract on profits of SC members and the entire SC.
| | | | | | | |
| Model DR | — | — | 3.06 | 6.13 | 12.25 | 21.44 | Model DH | — | — | 7 | 2 | 4 | 13 | Model DC | — | — | 4.08 | 2.72 | 8.17 | 14.97 | Figure 2, point | 0.87 | 0.625 | 30.63 | 6.13 | 12.25 | 49 | Figure 2, point | 0.39 | 0.14 | 7 | 29.75 | 12.25 | 49 | Figure 2, point | 0.86 | 0.14 | 7 | 6.15 | 35.85 | 49 |
|
|