Research Article
Distribution Network Reconfiguration for Power Loss Reduction and Voltage Profile Improvement Using Chaotic Stochastic Fractal Search Algorithm
Table 2
Result comparison of CSFSA with other methods for the 33-bus system.
| Method | Tie-switches | Power loss (kW) | ΔVD | Vmin (p.u.) | CPU time (s) |
| Initial | 33-34-35-36-37 | 203.68 | 0.0891 | 0.91081 | | FWA [29] | 7-9-14-28-32 | 139.98 | 0.0587 | 0.9413 | 6.4 | RRA [30] | 7-9-14-32-37 | 139.55 | 0.0622 | 0.9378 | 74.69 | HBB-BCA [32] | 7-9-14-32-37 | 139.55 | 0.0622 | 0.9378 | 3.05 | Fuzzy-SFLA [33] | 7-9-14-28-32 | 139.98 | 0.0588 | 0.9412 | — | MOIWO [34] | 7-9-14-32-37 | 139.55 | 0.0622 | 0.9378 | — | IAICA [35] | 7-9-14-32-37 | 139.51 | 0.0622 | 0.9378 | — | CSA [31] | 7-9-14-32-37 | 138.91 | 0.0576 | 0.94235 | — | FPEO [49] | 7-9-14-28-32 | 140.3350 | — | — | — | GWO-PSO [50] | 7-9-14-32-37 | 139.55 | — | — | 30.61 | ASFLA [51] | 7-9-14-28-32 | 139.98 | — | 0.9413 | — | CSFSA | 7-9-14-32-37 | 138.91 | 0.0576 | 0.94235 | 49.59 |
|
|