Research Article
Distribution Network Reconfiguration for Power Loss Reduction and Voltage Profile Improvement Using Chaotic Stochastic Fractal Search Algorithm
Table 3
Result comparison of CSFSA with other methods for the 84-bus system.
| Method | Tie-switches | Power loss (kW) | ΔVD | Vmin(p.u.) | CPU time (s) |
| Initial | 84-85-86-87-88-89-90-91-92-93-94-95-96 | 531.99 | 0.0715 | 0.9285 | | IMI-DE [36] | 7-13-34-39-41-55-62-72 - 83-86-89-90-92 | 469.88 | 0.0469 | 0.9531 | 36.15 | PGSA [37] | 7-13-34-39-42-55-62-72-83-86-89-90-92 | 469.88 | — | — | 113.25 | GA [38] | 7-13-34-39-42-55-62-72-83-86-89-90-92 | 469.878 | — | — | 7.809 | BB-BCA [32] | 7-33-38-55-62-72-83-86-88-89-90-92-95 | 471.62 | 0.04682 | 0.95318 | 13.25 | AIS-ACO [40] | 7-13-34-39-42-55-62-72-86-89-90-91-92 | 471.14 | 0.0521 | 0.9479 | — | Heuristic method [41] | 7-34-39-42-55-63-72-82-86-88-89-90-92 | 470.89 | — | — | — | CSFSA | 55-7-86-72-13-89-90-83-92-39-34-42-62 | 469.878 | 0.04681 | 0.95319 | 748.95 |
|
|