Research Article
A Modified Social Spider Optimization for Economic Dispatch with Valve-Point Effects
Table 9
Best dispatch obtained by ISSO for 40-unit system with PD 10500 MW.
| Unit | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| Output (MW) | 113.81 | 110.94 | 119.93 | 179.71 | 96.91 | 140.00 | 300.00 | 300.00 | 284.64 | 130.00 | Unit | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | Output (MW) | 94.00 | 94.00 | 125.00 | 214.77 | 304.39 | 483.77 | 498.09 | 489.49 | 511.50 | 511.22 | Unit | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | Output (MW) | 523.27 | 546.12 | 549.56 | 549.47 | 549.97 | 549.76 | 10.21 | 10.00 | 10.03 | 88.18 | Unit | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | Output (MW) | 190.00 | 190.00 | 190.00 | 200.00 | 200.00 | 200.00 | 110.00 | 110.00 | 109.98 | 511.29 |
| Total cost ($) | 122519.24 |
|
|