Research Article

Risk Evaluation of Sewage Treatment PPPABS Projects Using Combination Weight Method and D-S Evidence Theory

Table 4

Risk evaluation criteria.

Risk levelCorresponding risk value range

Very high ()[0.8, 1.0]
High ()[0.6, 0.8)
Moderate ()[0.4, 0.6)
Low ()[0.2, 0.4)
Very low ()[0, 0.2)