Simulation Framework for Cyber-Physical Production System: Applying Concept of LVC Interoperation

Table 2

Process time and resource by process in the production line of the case study.

No.ProcessProcess timeResource
MinAvg.Max

1Input8.8115.6620.81Worker
2Preassembly9.6015.5721.71Worker
3Assembly cell 116.6118.6121.6Worker
4Assembly cell 214.5318.6022.51Worker
5Inspection13.9518.0019.50Machine
6Packing13.3916.4020.42Worker