Simulation Framework for Cyber-Physical Production System: Applying Concept of LVC Interoperation
Table 2
Process time and resource by process in the production line of the case study.
| No. | Process | Process time | Resource | Min | Avg. | Max |
| 1 | Input | 8.81 | 15.66 | 20.81 | Worker | 2 | Preassembly | 9.60 | 15.57 | 21.71 | Worker | 3 | Assembly cell 1 | 16.61 | 18.61 | 21.6 | Worker | 4 | Assembly cell 2 | 14.53 | 18.60 | 22.51 | Worker | 5 | Inspection | 13.95 | 18.00 | 19.50 | Machine | 6 | Packing | 13.39 | 16.40 | 20.42 | Worker |
|
|