Research Article

Simulation Framework for Cyber-Physical Production System: Applying Concept of LVC Interoperation

Table 3

Throughput, cycle time, and working time for each process in the line.

No.ProcessThroughputCycle timeWorking time

1Input1,46018.915.02
2Preassembly1,45918.9215.61
3Assembly cell 11,45718.9418.9
4Assembly cell 21,45518.9718.49
5Inspection1,45418.9817.36
6Packing1,4531916.78