Research Article
Simulation Framework for Cyber-Physical Production System: Applying Concept of LVC Interoperation
Table 4
Throughput, cycle time, and working time per process in the line according to work time reorganization.
| No. | Process | Throughput | Cycle time | Working time |
| 1 | Input | 1,493 | 18.49 | 15.07 | 2 | Preassembly | 1,491 | 18.51 | 15.54 | 3 | Assembly cell 1 | 1,489 | 18.54 | 18.17 | 4 | Assembly cell 2 | 1,487 | 18.56 | 18.5 | 5 | Inspection | 1,485 | 18.59 | 17.42 | 6 | Packing | 1,484 | 18.6 | 16.72 |
|
|