Research Article

Simple Quadratic Interpolation-Inspired Symbiosis Organisms Search Algorithm for Optimal Placement of Capacitors in Radial Distribution Networks with Different Loading Models

Table 15

Comparison results of the 119-bus system before and after compensation with the CP load model at different load levels.

Load levelItemUncomp.Compensated
CSA [16]IHA [17]FPA [18]ABC [19]MGABC [30]SOScSQI-SOScSOSSQI-SOS

Light 50%, p.u.0.93850.9550.95520.95390.95660.95670.95670.95660.9566
Ploss, kW297.15208.96206.8402209.0868207.52206.65194.8344194.8289195.4589194.8911
PFoverall0.79980.870.91880.9140.89150.98830.97010.96930.96540.9685
MPF, kW5233.935202.315202.315202.935202.32
(#L1-2)(#L1-2)(#L1-2)(#L1-2)(#L1-2)

Medium 75%, p.u.0.90490.9330.920.93130.93360.93350.93350.93350.9335
Ploss, kW697.33471.01473.1488.83471.78482.01451.2657451.2566452.5665451.4294
PFoverall0.79980.910.92070.94190.90680.98600.96360.96380.96180.9633
MPF, kW7927.177852.327852.287853.627852.45
(#L1-2)(#L1-2)(#L1-2)(#L1-2)(#L1-2)

Full 100%, p.u.0.86880.9060.9020.908860.90730.90470.90490.90470.9047
Ploss, kW1298.09858.89843.1459853.1543854.39874.03846.6694846.2974847.3224847.0243
PFoverall0.79980.920.94880.94190.92950.98440.93600.93630.93440.9357
MPF, kW10677.9210547.8310547.6010548.4710548.23
(#L1-2)(#L1-2)(#L1-2)(#L1-2)(#L1-2)

Total annual cost ($/year)440,236.40332,077.38332,573.27336,216.33337,983.73359,583.69323,491.68323,488.99323,578.50
Annual net savings ($/year)108,159.02107,663.13104,020.07102,252.6780,652.70116,744.71116,747.40116,657.89
Worst cost ($/year)327346.43325,776.65326,745.33
Best cost ($/year)323,491.68323,488.99323,578.50
Mean cost ($/year)324,441.73324,248.97324,445.95
Standard deviation (786.63629.26644.11

The sign “” implies that for a fair comparison, the obtained load flow results are recycled with capacitor parameters given in [30] using our proposed load flow technique, and the total cost in [30] is also recalculated using equation (1) with the price data provided in Table 2.