Research Article
Study on Multiobjective Modeling and Optimization of Offshore Micro Integrated Energy System considering Uncertainty of Load and Wind Power
Table 1
Parameters related to GTs [
25].
| Number of units | 1 | 2 | 3 |
| Location of units | 1 | 1 | 4 | Maximum output (MW) | 0 | 0 | 0 | Minimum output (MW) | 12 | 9 | 12 | Maximum ramp up rate (MW/h) | 3 | 2 | 3 | Maximum ramp down rate (MW/h) | 3 | 2 | 3 | Whether equipped with WHRB | Yes | No | No | Quadratic pollution coefficient | 0.0047 | 0.0052 | 0.0074 | Linear pollution coefficient | 0.0940 | 0.0730 | 0.1180 | Constant coefficient | 0.4900 | 0.2855 | 0.5320 |
|
|