Research Article

Study on Multiobjective Modeling and Optimization of Offshore Micro Integrated Energy System considering Uncertainty of Load and Wind Power

Table 1

Parameters related to GTs [25].

Number of units123

Location of units114
Maximum output (MW)000
Minimum output (MW)12912
Maximum ramp up rate (MW/h)323
Maximum ramp down rate (MW/h)323
Whether equipped with WHRBYesNoNo
Quadratic pollution coefficient0.00470.00520.0074
Linear pollution coefficient0.09400.07300.1180
Constant coefficient0.49000.28550.5320