Research Article

Multisystem Optimization for an Integrated Production Scheduling with Resource Saving Problem in Textile Printing and Dyeing

Table 6

Result comparisons between manual scheduling, the proposed MSO algorithm, MO-MFEA, and NSGA-II for the integrated production scheduling with resource saving.

InstanceObjective functionsManual schedulingOptimization algorithms
MSOMO-MFEANSGA-II

J1Makespan1.45E + 03 ± 2.12E + 011.22E + 03±5.90E + 011.31E + 03 ± 2.86E + 011.36E + 03 ± 6.74E + 01
Production cost1.49E + 06 ± 5.34E + 049.98E + 05±2.14E + 031.05E + 06 ± 5.71E + 041.40E + 06 ± 7.58E + 04
Electricity consumption6.11E + 04 ± 8.22E + 025.01E + 04±3.27E + 025.35E + 04 ± 3.05E + 025.78E + 04 ± 3.65E + 02
Water wastage9.84E + 03 ± 5.37E + 028.15E + 03±2.36E + 018.61E + 03 ± 4.49E + 019.25E + 03 ± 1.18E + 01
Processing cost1.41E + 06 ± 5.36E + 041.12E + 06±1.75E + 041.24E + 06 ± 2.35E + 041.29E + 06 ± 2.36E + 04

J2Makespan7.85E + 02 ± 6.34E + 016.91E + 02±4.32E + 017.05E + 02 ± 1.18E + 017.10E + 02 ± 4.16E + 01
Production cost3.31E + 05 ± 7.48E + 032.75E + 05±7.78E + 033.03E + 05 ± 5.21E + 033.12E + 05 ± 5.42E + 03
Electricity consumption2.74E + 04 ± 4.02E + 022.29E + 04±6.63E + 022.48E + 04 ± 3.16E + 022.59E + 04 ± 3.60E + 02
Water wastage4.05E + 03 ± 2.30E + 013.36E + 03±9.17E + 013.56E + 03 ± 7.06E + 013.80E + 03 ± 8.82E + 01
Processing cost3.05E + 05 ± 6.32E + 032.51E + 05±2.64E + 032.79E + 05 ± 4.23E + 032.91E + 05 ± 1.16E + 03

J3Makespan7.08E + 02 ± 5.31E + 015.87E + 02±3.62E + 016.04E + 02 ± 7.18E + 016.50E + 02 ± 5.42E + 01
Production cost6.31E + 05 ± 8.55E + 035.04E + 05±1.31E + 035.51E + 05 ± 5.56E + 035.71E + 05 ± 3.18E + 03
Electricity consumption7.54E + 04 ± 4.60E + 026.28E + 04±3.47E + 026.32E + 04 ± 3.17E + 026.95E + 04 ± 4.29E + 02
Water wastage9.31E + 03 ± 8.66E + 017.93E + 03±6.36E + 018.19E + 03 ± 2.36E + 018.67E + 03 ± 8.15E + 01
Processing cost5.25E + 05 ± 4.14E + 034.35E + 05±7.89E + 034.61E+05 ± 4.42E + 034.73E + 05 ± 6.63E + 03

J4Makespan1.76E + 03 ± 7.12E + 011.53E + 03 ± 4.35E + 011.51E + 03±1.15E + 011.60E + 03 ± 7.24E + 01
Production cost8.12E + 05 ± 8.56E + 037.05E + 05 ± 6.69E + 037.01E + 05±3.27E + 037.35E + 05 ± 3.28E + 03
Electricity consumption4.51E + 04 ± 6.10E + 023.94E + 04 ± 3.78E + 023.85E + 04±8.13E + 024.00E + 04 ± 6.12E + 02
Water wastage8.05E + 03 ± 5.23E + 017.00E + 03 ± 1.47E + 016.90E + 03±9.74E + 017.41E + 03 ± 6.69E + 01
Processing cost5.37E + 05 ± 4.16E + 034.89E + 05 ± 4.58E + 034.78E + 05±6.32E + 034.91E + 05 ± 4.42E + 03

J5Makespan1.72E + 03 ± 1.59E + 011.44E + 03±6.61E + 011.56E + 03 ± 1.18E + 011.58E + 03 ± 8.15E + 01
Production cost9.96E + 05 ± 8.44E + 038.21E + 05±3.64E + 038.76E + 05 ± 2.35E + 039.25E + 05 ± 6.64E + 03
Electricity consumption7.84E + 04 ± 3.24E + 026.70E + 04±8.96E + 026.92E + 04 ± 4.43E + 027.30E + 04 ± 2.01E + 02
Water wastage1.22E + 04 ± 1.10E + 029.81E + 03±7.78E + 019.99E + 03 ± 1.06E + 011.13E + 04 ± 3.68E + 02
Processing cost8.94E + 05 ± 2.36E + 037.44E + 05±5.93E + 037.63E + 05 ± 4.45E + 038.32E + 05 ± 1.17E + 03

J6Makespan1.07E + 03 ± 4.41E + 011.01E + 03±1.74E + 011.04E + 03 ± 7.78E + 011.06E + 03 ± 5.24E + 01
Production cost2.96E + 05 ± 8.39E + 032.49E + 05±2.36E + 032.65E + 05 ± 5.36E + 032.75E + 05 ± 3.32E + 03
Electricity consumption2.62E + 04 ± 7.45E + 022.15E + 04±4.47E + 022.32E + 04 ± 1.13E + 022.48E + 04 ± 4.40E + 02
Water wastage4.21E + 03 ± 8.36E + 013.29E + 03±3.62E + 013.66E + 03 ± 7.58E + 014.01E + 03 ± 3.65E + 01
Processing cost1.56E + 05 ± 9.60E + 031.29E + 05±1.18E + 031.42E + 05 ± 6.31E + 031.47E + 05 ± 2.47E + 03

J7Makespan1.71E + 03 ± 2.36E + 011.45E + 03±6.35E + 011.51E + 03 ± 6.35E + 011.62E + 03 ± 1.29E + 01
Production cost1.11E + 06 ± 6.03E + 049.31E + 05±9.68E + 039.79E + 05 ± 4.47E + 031.02E + 06 ± 4.33E + 04
Electricity consumption3.67E + 04 ± 5.60E + 023.10E + 04±7.41E + 023.23E + 04 ± 1.18E + 023.45E + 04 ± 9.54E + 02
Water wastage1.18E + 04 ± 8.15E + 029.73E + 03±3.26E + 019.98E + 03 ± 5.69E + 011.03E + 04 ± 6.37E + 02
Processing cost1.16E + 06 ± 7.34E + 049.60E + 05±5.59E + 039.98E + 05 ± 6.37E + 031.07E + 06 ± 2.50E + 04

J8Makespan1.53E + 03 ± 8.56E + 011.32E + 03 ± 5.23E + 011.30E + 03±2.28E + 011.42E + 03 ± 4.31E + 01
Production cost4.16E + 05 ± 2.33E + 033.58E + 05 ± 1.82E + 033.51E + 05±1.25E + 033.82E + 05 ± 7.89E + 03
Electricity consumption5.53E + 04 ± 6.34E + 024.87E + 04 ± 4.34E + 024.68E + 04±4.13E + 025.35E + 04 ± 1.12E + 02
Water wastage7.62E + 03 ± 7.79E + 016.71E + 03 ± 8.29E + 016.45E + 03±8.75E + 017.02E + 03 ± 5.36E + 01
Processing cost3.91E + 05 ± 4.18E + 033.37E + 05 ± 1.44E + 033.30E + 05±5.36E + 033.63E + 05 ± 8.92E + 03

J9Makespan1.56E + 03 ± 6.40E + 011.33E + 03±2.54E + 011.36E + 03 ± 1.23E + 011.40E + 03 ± 1.23E + 01
Production cost2.28E + 06 ± 8.23E + 041.78E + 06±1.98E + 041.92E + 06 ± 7.55E + 042.02E + 06 ± 5.51E + 04
Electricity consumption4.92E + 04 ± 5.26E + 024.30E + 04±6.65E + 024.37E + 04 ± 1.34E + 024.46E + 04 ± 4.33E + 02
Water wastage1.98E + 04 ± 7.41E + 021.66E + 04±1.27E + 021.77E + 04 ± 9.25E + 021.75E + 04 ± 7.75E + 02
Processing cost1.89E + 06 ± 2.35E + 041.52E + 06±3.65E + 041.58E + 06 ± 3.11E + 041.72E + 06 ± 8.24E + 04

J10Makespan2.21E + 03 ± 5.01E + 011.83E + 03±4.42E + 012.03E + 03 ± 7.42E + 012.19E + 03 ± 5.61E + 01
Production cost3.30E + 05 ± 8.42E + 032.74E + 05±1.12E + 033.02E + 05 ± 6.35E + 033.29E + 05 ± 8.76E + 03
Electricity consumption4.77E + 04 ± 7.41E + 023.95E + 04±7.14E + 024.19E + 04 ± 8.17E + 024.67E + 04 ± 5.32E + 02
Water wastage9.21E + 03 ± 8.56E + 017.66E + 03±8.23E + 018.11E + 03 ± 3.62E + 018.26E + 03 ± 9.01E + 01
Processing cost2.67E + 05 ± 9.62E + 032.23E + 05±3.31E + 032.44E + 05 ± 4.28E + 032.66E + 05 ± 5.27E + 03