Research Article

Multisystem Optimization for an Integrated Production Scheduling with Resource Saving Problem in Textile Printing and Dyeing

Table 7

Saving ratio comparisons between manual scheduling, the proposed MSO algorithm, MO-MFEA, and NSGA-II for the integrated production scheduling with resource saving.

InstanceObjective functionsSaving ratio (%)
MSOMO-MFEANSGA-II

J1Makespan15.869.666.21
Production cost33.0229.536.04
Electricity consumption18.0012.445.40
Water wastage17.1712.506.00
Processing cost20.5712.068.51

J2Makespan11.9711.089.55
Production cost16.928.465.74
Electricity consumption16.4212.045.47
Water wastage17.0412.106.17
Processing cost17.7011.804.59

J3Makespan17.0914.698.19
Production cost20.1312.689.51
Electricity consumption16.7116.187.82
Water wastage14.8212.036.87
Processing cost17.1412.199.90

J4Makespan13.0714.209.09
Production cost13.1813.679.48
Electricity consumption12.6414.6311.31
Water wastage13.0414.297.95
Processing cost8.9410.998.58

J5Makespan16.2811.638.14
Production cost17.5712.057.13
Electricity consumption14.5411.736.89
Water wastage19.5919.367.38
Processing cost16.7814.656.94

J6Makespan5.612.800.93
Production cost15.8810.477.09
Electricity consumption17.9411.455.34
Water wastage21.8513.064.75
Processing cost17.3115.385.77

J7Makespan15.2011.705.26
Production cost16.1311.808.11
Electricity consumption15.5311.995.99
Water wastage17.5415.4212.71
Processing cost17.2413.977.76

J8Makespan13.7315.037.19
Production cost13.9415.638.17
Electricity consumption13.7415.373.25
Water wastage14.5715.357.87
Processing cost13.8115.607.16

J9Makespan14.7412.8210.26
Production cost21.9315.7911.40
Electricity consumption12.6011.189.35
Water wastage16.1610.6111.62
Processing cost19.5816.408.99

J10Makespan17.1912.670.90
Production cost16.678.480.30
Electricity consumption17.1912.162.10
Water wastage16.8311.9410.31
Processing cost16.4812.360.37