Research Article
An Optimal DoS Attack Strategy Disturbing the Distributed Economic Dispatch of Microgrid
Figure 5
EDP with disconnected topology under DoS attacks. (a) The power output of each generator. (b) The incremental cost of each generator. (c) Auxiliary variable y of each generator. (d) Total power output and load demand.
(a) |
(b) |
(c) |
(d) |