Research Article

[Retracted] Cluster Coordination between High-speed Rail Transportation Hub Construction and Regional Economy Based on Big Data

Table 7

Optimal routes with minimum total cost.

Num.Serial numberPathMode of transportTotal distance (km)Total time (h)Total cost (yuan)

2.111.323.271.313.321.19
3.322.83.454.292.925.14
4.754.491.533.481.784.78
3.744.052.432.733.794.31
3.734.586.113.114.054.4