Research Article
A Two-Stage Offline-to-Online Multiobjective Optimization Strategy for Ship Integrated Energy System Economical/ Environmental Scheduling Problem
Figure 2
Fitted curves by big data and the actual curves of the load demand and wind speed. (a) Load demand. (b) Wind speed.
(a) |
(b) |