Research Article
A Two-Stage Offline-to-Online Multiobjective Optimization Strategy for Ship Integrated Energy System Economical/ Environmental Scheduling Problem
Table 1
Parameter settings of ESS.
| Initial cost (m.u./kW) | 567 | Replacement cost (m.u./kW) | 467.9 | Maintenance cost (kW·h·y) | 2.67 | Charging efficiency | 0.86 | Discharge efficiency | 0.86 | SOCmax | 0.9 | SOCmin | 0.3 | Initial SOC | 0.5 | Service life (yr) | 2.5 |
|
|