Research Article

Optimal Control Strategy of Platform Load Oriented to Network and Load Cooperation

Table 10

Load demand response attributes of each user.

Load numberMaximum /average loadLoad start timeLoad end timeMinimum running timeMinimum /average loadMinimum downturn timeIncentive scheduling cost (first stage)Incentive scheduling cost (second stage)Incentive scheduling cost (third stage)Stand-by costTotal limit calls number of stimulated DRMaximum reserve capacity of incentive DRPDR/IDRLoad type

11.1512440.7545101538200PDR&IDRTranslational
21.1512430.753510203830PDR&IDRTransferable
31.1512420.752510253830PDR&IDRReducible
41.1512420.752515303840PDR&IDRReducible
51.1512410.75050505020180PDR&IDRReducible
61.1512420.752491438200PDR&IDRTranslational
71.1512430.75349192830PDR&IDRTransferable
81.1512420.75249242830PDR&IDRReducible
91.1512420.752414292840PDR&IDRReducible
101.1512410.75050505020180PDR&IDRReducible
111.1512400.7501000100010001000160PDR
121.1512400.750100010001000100080PDR
131.1512400.750100010001000100080PDR
141.1512400.750100010001000100080PDR
151.1512400.750100010001000100010PDR