Research Article

Energy-Optimal 3D Path Planning for MAV with Motion Uncertainty

Table 4

Performances of the proposed algorithm in different grid sizes.

Grid size20 × 20 × 1040 × 40 × 20

Averaged path length (m)9.6429.186
Averaged climbing and descending rate (m/s)0.1380.117
Averaged minimum turning angle47.39°48.62°
Computing time (s)3.80231.122