Research Article

Developing an Integrative Data Intelligence Model for Construction Cost Estimation

Table 1

Descriptive measures of the cost data for the training phase.

MinimumMaximumMeanMedianStd. deviationSkewnessKurtosis

Ground floor area (m2)2005320162213701196.2521.1270.466
Total floor area (m2)3559088313525252214.7881.0790.466
Floor number162.76221.7110.651−1.052
Elevator number040.79401.0021.0730.349
Footing type (raft = 1; separated = 2)
Inflation (%)0.17.52.4841.82.1610.775−0.656
Duration (days)122731357.6348137.1710.7150.652
Cost ($)2675664515191975260132163016230760.903−0.312