Research Article

Convergence Study of Minimizing the Nonconvex Total Delay Using the Lane-Based Optimization Method for Signal-Controlled Junctions

Table 2

Optimization results from the cutting plane algorithm.

Optimal cycle length = 71.24 seconds
(2.1)(2.2)(2.3)–(2.6)(2.7)(8)(2.8)(2.9)(2.10)(2.11)(2.12)(2.13)
From armLaneTo armSum of lane flowTurning proportionSaturation flowyEffective greenDegree of sat.Green startTotal delay
1234

11241.4241.41.001746.70.138227.80.35410.01.0148
12258.6258.61.001871.10.138227.80.35410.01.0808
13200.0200.00.002105.00.095011.00.612916.81.8419
14100.0100.01.001871.10.05346.00.634635.41.2849

2148.348.31.001746.70.02769.40.208656.80.3575
2251.751.71.001871.10.02769.40.208656.80.3812
23500.0500.00.002105.00.237519.90.851446.45.2316
24100.0100.01.001871.10.053411.80.32380.00.7256

31300.0300.01.001746.70.171830.40.40290.01.1842
32300.0300.00.002105.00.142513.60.746216.83.0261
33150.0150.01.001871.10.08028.60.666932.81.7250
34150.0150.01.001871.10.08028.60.666932.81.7250

41100.0100.01.001746.70.057330.90.132135.40.3123
42400.0400.00.002105.00.190019.90.681146.42.9411
43200.0200.01.001871.10.106911.80.647571.21.9255
44200.0200.01.001871.10.106911.80.647571.21.9255

26.6830