Research Article
Computation and Analysis of High Rocky Slope Safety in a Water Conservancy Project
Table 1
Monitored points to different heights from downstream to upstream.
| Points noted | Height (m) | Points name | Height (m) | Points noted | Height (m) | Points noted | Height (m) | Points noted | Up to down (m) |
| G2-II | 2923.5 | G8-I | 2865.0 | G10-I | 2689.9 | G4-I | 2589.7 | G6-II | 2839.1 | G3-II | 2918.1 | G1-I | 2852.9 | TP1-10 | 2677.9 | TP1-3 | 2569.8 | TP3-4 | 2654.8 | G1-II | 2932.1 | G4-II | 2888.8 | TP3-4 | 2654.8 | TP3-3 | 2592.1 | TP3-11 | 2562.0 | LG01 | 2933.8 | / | / | TP4-1 | 2683.9 | TP3-12 | 2593 | TP1-2 | 2461.0 | / | / | / | / | / | / | TP4-2 | 2547.2 | / | / |
|
|