Research Article

Timetable Design for Urban Rail Line with Capacity Constraints

Table 4

Comparison between different optimal results.

δ (s) (USD) (USD) (USD)CPU (s)

2810.5912693.3315503.92 (85.2%)5834.57
2841.8412693.3315535.17 (85.4%)2768.51
3136.2512693.3315829.58 (87.0%)929.09
Even-headway3259.3514933.3318192.69 (100%)281.36