Research Article
Optimal Control Problem of Converter Steelmaking Production Process Based on Operation Optimization Method
Table 1
The training set and the testing set for multistage temperature models and carbon content models.
| Temperature | Carbon content | Stage/°C | The training set | The testing set | Stage/% | The training set | The testing set |
| 1540–1560 | 100 | 10 | 0.30–0.20 | 100 | 10 | 1560–1580 | 100 | 10 | 0.20–0.10 | 100 | 10 | 1580–1600 | 100 | 10 | 0.11-0.10 | 100 | 10 | 1600–1620 | 200 | 10 | 0.10-0.09 | 100 | 10 | 1620–1640 | 200 | 20 | 0.09-0.08 | 100 | 10 | 1640–1660 | 100 | 10 | 0.08-0.07 | 100 | 10 | 1660–1680 | 100 | 10 | 0.07-0.06 | 100 | 10 | 1680–1700 | 100 | 10 | 0.06-0.05 | 100 | 10 | 1700–final | 40 | 10 | 0.05-0.04 | 100 | 10 |
| | | | 0.04–final | 60 | 10 |
|
|