Research Article

Optimal Control Problem of Converter Steelmaking Production Process Based on Operation Optimization Method

Table 6

The calculated value of addition quantity and time of auxiliary material.

Time (second)Auxiliary material 1Auxiliary material 2Auxiliary material 3Auxiliary material 4Auxiliary material 5Auxiliary material 6Auxiliary material 7

0.60000000
1.80000000
28.20000000
30303000000
31.80000000
91.80000000