Research Article
An Optimization Method for the Remanufacturing Dynamic Facility Layout Problem with Uncertainties
Figure 5
The dynamic layout scheme for a whole year (total cost = 83035).
(a) The dynamic layout scheme for 1–4 months (material handling cost = 23224) |
(b) The dynamic layout scheme for 5–8 months (total cost = 32148) |
(c) The dynamic layout scheme for 9–12 months (total cost = 27663) |