Research Article

An Optimization Method for the Remanufacturing Dynamic Facility Layout Problem with Uncertainties

Table 3

Comparison of the average total cost of two cases.

Arrival rate levelThe average total cost Cost difference 
Cost reduction ratio 
The static layout 
The dynamic layout 

10091578084288310.226239
12494790250346970.277694
148068109396386720.261177
178295135050432450.242547
196572147063495090.251862
233200178090551100.236321
Sample mean163666.2122988.841677.330.249307
Sample standard deviation48604.437507.919664.5170.018437