Research Article

Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains

Table 1

Trains passing through given blocking zone within certain time interval.

NumberTrainCategories (m/s, km/h)Running direction

I82702Luggage and parcel express train33.33, 120Up
II26512Through freight train25.00, 90Up
III70210OGT13.90, 50Up
IV26561Through freight train25.00, 90Down
V36531Depot freight train22.20, 80Down
VI70641OGT11.10, 40Down